Heat Exchangers 16 Segments TP304L Stainless Steel Tubing
A213 T22 , OD1'' X 54' Length X 10FPI X Alu 1100 Fins , extruded high fin cooling tube
Tube Type:Seamless (Cold Drawn)
Ends:Plain ends or bevel ends.
Surface protection:black painting,anti-rust oil or varnish.
Description:
Manufacturing Process
A smooth core tube is inserted into an aluminum sleeve and then the fins are extruded out of the aluminum sleeve.
Fins Type:
The fins are solid plain or serrated into 12,16 or 24 segments or as your design.
Unfinned Section
Both plain ends with appr. 10mm~50mm and gaps (Unfinned Section) in the middle.
Surface Coating
Both bare ends of Bimetallic Finned Tubes shall be Zinc or Aluminum that metallized applied by an electro spray arc system coating.
Accessories
Tube Support Box, Clamp or Spacer Box(Materials: Aluminum, Zinc or Stainless Steel).
Applications:
The common application fileds are:
Heat exchangers units for power plant(electric, nuclear, thermal and geothermal power plants);
High corrosive systems (condensers, evaporators, sea water desalinations, fertilizing, urea systems, ammonia, gas, corrosive acids);
The petroleum, chemical and petrochemical industries;
The food processing and refrigeration industries;
Natural gas treatment;
Quick Details |
|||
Condition: |
New |
Brand Name: |
YONGHUI |
Place of Origin: |
China |
Tube OD : |
12mm min.~50.8mm(2'') max. |
Tube length : |
no limit |
Fin height : |
16 mm max. |
Fin pitch : |
1.5mm min. |
Extruded fins type: |
solid plain and serrated. |
Fin Thickness: |
appr. 0.4mm/0.5mm/0.6mm |
Production Capacity: |
Daily capacity up to 15,000 meters. |
Packing: |
Steel frame with plywoods or seaworthy wooden box. |
Marketing Type: |
New Production 2020 |
Warranty: |
1 Year |
After Warranty Service: |
Online support |
Machinery Test Report: |
Provided |
Certification: |
CE. ISO,EN10204. 3.1 Cert. |
After-sales Services: |
Video technical support, Online support |
Showroom Location: |
None |
Local Service Location: |
None |
|
|
Competitive Advantage:
We have more than 10,000 square meters workshop, including 10 extrusion finning machines, daily extrusion capacity up to 3,000 Meters.
The extrusion finning machines are designed and assembled by ourselves and we can offer you finning machines, extrusion muff sleeves and all accessories (extrusion finning disks) etc...
DR-extruded bimetallic fin tubes maximum operating temperature: 300 degree. The transfer coefficient remains steady.
DR-extruded bimetallic fin tubes have stronger fins than other mechanical fins, like L, LL, KL, and G, so it is much easier to clean.
In application of high stress and corrosive condiction, DR-extruded bimetallic fin tubes provides an excellent technical and economical savings in comparsion to a costlier single alloy tube, as the use of costlier material is reduced to the min.
Our Service |
|
1 |
Inquiry-Professional quotation, or send inquiry item more details, we start contact more details |
2 |
Confirm the price, lead time, payment term etc |
3 |
Our sales send the Proforma Invoice with our seal, or you order online to us |
4 |
Customer make the payment for deposit and send us Bank receipt |
5 |
Intial Production Stage-Inform the clients that we habe got the payment, and will make the samples according to your request, send you photos or samples to get your approval. After approval, we inform that we will arrange the production & inform the estimated time |
6 |
Middle Production-send photos to show the production line which you can see you products. Confirm the estimated delivery time again. |
7 |
End Production-Mass production products photos and samples will send to you for approval. You can also arrange the third party inspection |
8 |
Clients make payment for balance and ship goods, inform the tracking number and check the status for clients |
9 |
Order can be say "finish" when you receive the goods and satify with them |
10 |
Feedback to our about Quality, Service, Market Feedback & Suggestion. And we can do better |