SeamlessTreated U Tube Bundle Heat Exchanger A179 Tubing
Quick Details | |||
Condition: | New | Brand Name: | YONGHUI |
Place of Origin: | China | Marketing Type: | New Production 2020 |
Warranty: | 1 Year | After Warranty Service: | Online support |
Machinery Test Report: | Provided | Certification: | CE. ISO,EN10204. 3.1 Cert. |
After-sales Services: | Video technical support, Online support | Packing: | Steel frame with plywoods or seaworthy wooden box. |
Local Service Location: | None | Showroom Location: | None |
More Standard and Grade:
ASTM A210/ASME SA210 A1
ASTM A213/ASME T11 T22
A106B/A53B/A179/A192/A200/A333/A335/500
ASME SA106B/A53B/A192/A200/A333/A335/500
BS3059 BS6323-4 BS3602-1
EN10297-1 EN10305-1 EN10216-1 EN10216-2 EN10210-1
DIN1629 DIN1630 DIN 17175 DIN2391 DIN17204 DIN2448
JIS G3452(SGP) JIS G3461JIS G3462 JIS G3454JIS G3455 JIS G3444
Both Ends:
Plain ends or bevel ends
Straight Tubes Maximum Length:
(Before Bending): 35000 mm.
Heat Treatment
Stress Relieved After U-Bending (Bending Area Plus 300MM For Each Leg).
Hydrostatic Test After U Bending
Maximum Test Pressure 600 Bar, Holding time: 10 Sec.
Medium: Dematerialized Water.
Compressed Air Cleaning After Hydro-Test.
Packaging
In Strong Transport-Worthy Pre-fumigated wooden boxes of corresponding dimensions for
each tube Length, Radius, Diameter, According To PO requirements as well as wrapped In polyethylene
films With soft plastic caps on both end of Tube.
General Quality Tests
Corrosion Test | Conducted only when specially requested by the client |
Chemical Analysis | Test done as per required quality standards |
Destructive / Mechanical Testing | Tensile | Hardness | Flattening | Flare | Flange |
Reverse-bend and Re. flat tests | Carried out in full compliance with relevant standards & ASTM A-450 and A-530 norms, which ensures trouble-free expansion, welding & use at customers end |
Eddy Current Testing | Done to detect homogeneities in subsurface by using Digital Flaw-mark Testing System |
Hydrostatic Testing | 100% Hydrostatic Testing carried out according to ASTM-A 450 norms for checking tube leakage, and biggest pressure we can support 20Mpa/7s . |
Air Under Pressure Test | To check any evidence of air leakage |
Visual Inspection | After passivation, every single length of tubes & pipes is subjected to thorough visual inspection by trained staff for detecting surface flaws & other imperfections |
Supplementary Testing : Apart from the above mentioned tests, we also carry out on the manufactured products supplementary testing. The tests conducted under this include:
|
|
|
Our Service:
1. Inquiry-Professional quotation, or send inquiry item more details, we start contact more details
2. Confirm the price, lead time, payment term etc
3. Our sales send the Proforma Invoice with our seal, or you order online to us
4. Customer make the payment for deposit and send us Bank receipt
5. Initial Production Stage-Inform the clients that we have got the payment, and will make the samples according to your request, send you photos or samples to get your approval. After approval, we inform that we will arrange the production & inform the estimated time
6. Middle Production-send photos to show the production line which you can see you products. Confirm the estimated delivery time again.
7. End Production-Mass production products photos and samples will send to you for approval. You can also arrange the third party inspection
8. Clients make payment for balance and ship goods, inform the tracking number and check the status for clients
9. Order can be say "finish" when you receive the goods and satisfy with them
10. Feedback to our about Quality, Service, Market Feedback & Suggestion. And we can do better