Seamless Superheater TP321 Stainless Steel U Bend Tube and U Shaped Tube for Heat Exchanger Applications
TP321 Stainless Steel U Shaped Tube
,Superheater Stainless Steel Tubing Elbows
,Superheater U Shaped Tube
Seamless Superheater TP321 Stainless Steel U-Shaped Tube manufactured to ASTM A213 TP321 / 321H specifications. These seamless stainless steel U-bend superheater tubes are produced in accordance with ASTM A213/A213M — the standard specification for seamless ferritic and austenitic alloy-steel boiler, superheater, and heat-exchanger tubes.
U-bend tubes are also manufactured in accordance with the following standards:
- ASTM A688 / ASME SA688
- ASTM A803 / ASME SA803
- ASTM A556 / ASME SA556
| Ferrite | Austenite | Duplex | Super Duplex | Ni-Alloys | Titanium |
|---|---|---|---|---|---|
| TP410, TP405, S44400, S44660, TP430 | TP304/304L, TP316/316L, TP316Ti, TP317/317L, TP321, TP347 | S31803, S32205, S32304 | S32750, S32760 | N06600, N08020, N00880, N08825, N08904 | Gr.2 |
- Straight Tube Maximum Length (before bending): 35,000 mm
- Unit Leg Length: Minimum 1 meter; Maximum 16,500 mm (for maximum radius R = 1,500 mm)
- Heat Treatment: Stress relieved after U-bending (bending area plus 300 mm for each leg)
- Hydrostatic Test: Performed after U-bending; maximum test pressure 600 bar, holding time 10 seconds; medium: demineralized water
- Post-Test Cleaning: Compressed air cleaning after hydrostatic testing
Tubes are packed in strong, transport-worthy, pre-fumigated wooden boxes of corresponding dimensions for each tube length, radius, and diameter, in accordance with PO requirements. Each tube is wrapped in polyethylene film with soft plastic caps on both ends.
| Test | Description |
|---|---|
| Corrosion Test | Conducted only when specially requested by the client |
| Chemical Analysis | Performed as per required quality standards |
| Destructive / Mechanical Testing | Tensile, hardness, flattening, flare, and flange tests |
| Reverse-Bend and Re-Flat Tests | Carried out in full compliance with relevant standards and ASTM A-450 and A-530 norms, ensuring trouble-free expansion, welding, and use at the customer's end |
| Eddy Current Testing | Performed to detect inhomogeneities in the subsurface using a digital flaw-mark testing system |
| Hydrostatic Testing | 100% hydrostatic testing carried out according to ASTM A-450 norms for checking tube leakage; maximum supported pressure 20 MPa / 7 s |
| Air Under Pressure Test | To check for any evidence of air leakage |
| Visual Inspection | After passivation, every single length of tube and pipe is subjected to thorough visual inspection by trained staff to detect surface flaws and other imperfections |
In addition to the tests listed above, the following supplementary tests are also carried out on manufactured products:
- Eddy Current Testing
- O.P. Testing
- Radiography Testing
- Corrosion Testing
- Micro Testing
- Macro Testing
- IGC Testing
- Ultrasonic Testing
- Liquid Penetrant Testing
- Inquiry: Professional quotation provided, or send us more details on your inquiry item and we will contact you for further details.
- Confirmation: Confirm the price, lead time, payment terms, and other details.
- Proforma Invoice: Our sales team sends the Proforma Invoice with our seal, or you may place your order online.
- Deposit Payment: Customer makes the deposit payment and sends us the bank receipt.
- Initial Production Stage: We inform clients that payment has been received and prepare samples according to your request, sending photos or samples for your approval. After approval, we arrange production and inform you of the estimated time.
- Middle Production: We send photos showing the production line so you can see your products, and confirm the estimated delivery time again.
- End Production: Mass production product photos and samples are sent to you for approval. You may also arrange third-party inspection.
- Balance Payment & Shipping: Client makes the balance payment and ships the goods; we inform you of the tracking number and check the status for you.
- Order Completion: The order is considered "finished" when you receive the goods and are satisfied with them.
- Feedback: Share your feedback with us on quality, service, market feedback, and suggestions so we can continue to improve.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube