Precision Superheater Economizer Heat Exchanger U Bend Tube and U Shaped Tube for Boiler Pressure Vessels
Economizer Heat Exchanger U Tube
,Superheater U Tube Type Heat Exchanger
,Superheater Heat Exchanger U Tube
Stainless steel U-bend tubes, carbon steel U-tubes, heat exchanger U-fin tubes, boiler U-bend tubes, U-tube bundles, and U-tube coils — engineered to design and drawings for demanding thermal service.
- Tube OD: Up to 76 mm maximum
- Tube Wall Thickness: 0.5 mm to 8 mm
- Bending Radius: 1.5 mm to 1500 mm
- Developed Length: 25 meters maximum
Stainless steel U-bend tubes are manufactured in accordance with design and drawings. Bending radius, center-to-center (C to C) distance, and straight leg length are required for U-bending tubes.
U-bend tubes are manufactured in accordance with design and drawings. Bends may be heat treated as per client requirements, followed by hydrostatic or pneumatic testing if required.
- Integral low fins on straight portions are permitted; please refer to our low fin tube data sheet.
- Marking is possible after bending on the straight portions of the U-bending tube.
- The manufacturing process for bare tubes is cold drawn or cold rolled.
- Bare tubes are annealed, pickled, and bright annealed prior to bending.
- Acceptance criteria: inspection test plans, design and drawings, and layout check.
- U-bent tubes are oiled or varnished for rust prevention and stenciled at the ends.
- Heat treatment: stress relieved after U-bending (bending area plus 300 mm of each leg).
- Delivery condition: tube ends are square cut, free of burrs, internally dried and air blown clean, and externally coated with varnish at both ends. Desiccants are placed in each package for continental transportation.
- Pressure vessels, including heat exchangers.
- Boilers and boiler-related equipment, such as superheaters and economizers.
Core tube: Any metallic material, including carbon steel, low-alloy steel, stainless steel, brass, copper, copper-nickel alloys, aluminum bronze, and nickel alloys.
| No. | Standard Specification |
|---|---|
| 1 | Standard specification for carbon steel seamless tubes/pipes for temperature services (ASTM A 106 Gr A/B/C) |
| 2 | Standard specification for carbon steel seamless tubes/pipes for heat exchangers and condensers (ASTM A 179) |
| 3 | Standard specification for carbon steel boiler tubes/pipes for high-pressure services (ASTM A192) |
| 4 | Standard specification for seamless carbon steel boiler and superheater tubes (ASTM A210 A1/C) |
| 5 | Standard specification for seamless alloy steel boiler and superheater tubes (ASTM A213 T2/T11/T12/T22) |
| 6 | Standard specification for seamless alloy steel pipes for low-temperature services (ASTM A333 Gr. 1/6) |
| 7 | Standard specification for seamless carbon and alloy steel tubes for low-temperature services (ASTM A334 Gr. 1/6) |
| 8 | Standard specification for seamless ferritic alloy steel pipes for low-temperature services (ASTM A335 P11/P12/P22) |
| 9 | Standard specification for seamless carbon steel tubes for boilers and superheaters (BS3059) |
| 10 | Standard specification for seamless alloy steel tubes for boilers, pipelines, and pressure vessels for temperatures up to 600 °C (DIN 17175) |
- More than 10,000 square meters of workshop space, including 3 bending and finning machines with a maximum capacity of OD 76 mm × 8 mm thickness.
- Shanghai Port is our nearest seaport and airport, less than 2 hours' drive from our workshop, ensuring convenient transportation.
- Tube stock availability for general grades of carbon steel and stainless steel.
- Quick engineering know-how support.
- Inquiry: Professional quotation, or send us more details on your inquiry item so we can begin discussing specifics.
- Confirm the price, lead time, payment terms, and other details.
- Our sales team sends the Proforma Invoice with our seal, or you may place your order online.
- Customer makes the deposit payment and sends us the bank receipt.
- Initial Production Stage: We inform clients that payment has been received and produce samples per your request, sending photos or samples for your approval. After approval, we arrange production and inform you of the estimated timeline.
- Middle Production: We send photos showing the production line so you can see your products, and reconfirm the estimated delivery time.
- End Production: Mass production product photos and samples are sent for your approval. You may also arrange third-party inspection.
- Client makes the balance payment and ships the goods; we provide the tracking number and monitor the status for you.
- The order is considered "finished" once you receive the goods and are satisfied with them.
- We welcome feedback on quality, service, market response, and suggestions so we can continue to improve.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube