Stainless Tube Embedded Fin Tube X46cr13 Material G Type Fin Tube for 450C Working Temperature Heat Transfer
Aluminium Extruded Fin Tube
,Finned Aluminum Extrusion Tube
DELLOK (YONGHUI RADIATING PIPE MANUFACTURING CO., LTD.) is a leading manufacturer of high-performance finned tubes and heat transfer solutions, delivering precision-engineered products for demanding industrial applications worldwide.
Established in 2002 and located in Jiangsu, China, DELLOK has grown into a substantial manufacturing enterprise with 66 million yuan in fixed assets, more than 200 employees, and 33 technical specialists. Our production infrastructure includes:
- 4 aluminum processing production lines with an annual processing capacity exceeding 20,000 tons
- 5 tube-drawing production lines
- 47 fin tube production lines
- 1 imported production line from the American brand McElroy
- Annual production capacity of over 12 million meters
Quality is our eternal pursuit. Our meticulous production workshop, standardized management system, and systematic quality assurance represent DELLOK's strongest commitment to quality. Quality control is not limited to final inspection — it is applied throughout the entire production process. Each batch of pipes is sampled and tested, with records maintained as a quality guarantee for the final product.
The Embedded Fin Tube (also known as the "G Type" fin tube) is manufactured by winding a fin strip into a machined groove on the base tube, then securely locking it into place by back-filling with base tube material. This technique ensures maximum heat transfer efficiency and supports working temperatures up to 450°C.
- High Frequency Welded Fin Tube
- U Bend Tube for Heat Transfer
- H/HH Type Fin Tube
- Integral High Finned Tube
- G Finned Tube
- Integral Low Finned Tube
- Longitudinal Finned Tube
- Studded Tube
- L/LL/KL/KL Finned Tube
- Laser Welded Finned Tube
- Fin Tube Coil
- Extruded Finned Tube
- Tubular Heat Exchanger
- Plate Heat Exchanger
- Finned Tube Heat Exchanger
- Brazed Heat Exchanger
Product Categories: Extruded Finned Tube
A: Generally, samples require 1–3 days, and mass production requires 15–30 days, depending on your specific request.
A: We provide a one-year warranty for our products.
A: We accept Trade Assurance, T/T, and Western Union.
A: We offer air freight, sea freight, and express delivery. We will select the most suitable transportation method according to your requirements.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube