SCH 40 Resistance Welded Studded Tube and Studded Finned Tube for Oil Refineries
DELLOK Studded Finned Tube
,Oil Refineries Studded Finned Tube
,SCH 40 Studded Finned Tube
Dellok (YONGHUI Radiating Pipe Manufacturing Co., Ltd.) was established in 2002 and is located in Nanjing, China. In 2022, we joined HARBIN AIR CONDITIONING CO., LTD., becoming one of the most professional industry manufacturers in China.
After years of development, the company now holds 66 million yuan in fixed assets, employs more than 200 people, and retains 33 technical staff. Our production capabilities include:
- 4 aluminum processing production lines with an annual processing capacity exceeding 20,000 tons
- 5 tube-drawing production lines
- 47 fin tube production lines
- 1 imported production line from the American brand McElroy
- Annual production capacity of 12 million meters and above
Quality is the eternal pursuit of our company.
Stud pipes (or stud tubes) are used by the refining and petrochemical industries for many different applications, including fired heaters and furnaces. They also serve as an alternative to high-frequency welded finned tubes (HF finned tubes).
Studs are attached to the pipe around the circumference in completely opposing pairs by means of electrical resistance welding. This ensures a high-integrity bond for strength and heat flow.
A key advantage of studded pipe is that it is relatively easy to clean. It is ideal for applications where heavy fouling of the external surface may occur, or for processes undertaken in harsh environments where dirty fuels are used. The surface can be efficiently shot blasted without damage.
Steel studs are automatically resistance welded to the tube, producing high-quality forge welds. The welding process enables the combination of any grades for studs and tube, including carbon steel, low alloy steel, stainless steel, and high nickel alloys.
- Increases the surface area of the tube and protects the tube surface from direct exposure to heat and corrosive environments.
- Reduces the amount of bare pipe required — the heat transfer surface of one studded pipe is equivalent to that of 4 to 10 bare pipes.
- Ideal for processes and applications where dirty fuels are used in harsh environments.
- Manufacturing Process: Electric resistance welding
- Fin-to-Tube Bond: Excellent
- Heat Transfer Efficiency: Excellent
- Mechanical Resistance: Excellent — can be frequently cleaned with high-pressure jets unlike other fin tubes, reducing downtime and increasing overall service life
- Corrosion Protection: Provides excellent corrosion protection to the base tube since the studs entirely cover the base tube (except bare ends)
- Temperature Range: Dependent on the properties of the stud (fin) and pipe materials
High-density crude oil is passed through studded tubes that are heated from outside. The liquefied product exits from the other end, ready for further processing.
Navy boilers also require studded tubes with oval-shaped studs welded on them. These are used for heating water in water-tube boilers.
| Product Specification | ||
|---|---|---|
| Tube OD | 25~273 (mm) | 1"~10" (NPS) |
| Tube Wall Thk | 3.5~28.6 (mm) | 0.14"~1.1" |
| Tube Length | ≤25,000 (mm) | ≤82 ft |
| Stud Thk | 6~25.4 (mm) | 0.23"~1" |
| Stud Height | 10~35 (mm) | 0.4"~1.38" |
| Stud Pitch | 8~30 (mm) | 0.3"~1.2" |
| Stud Type | Cylindrical, Elliptical, Lens type | |
| Stud to Tube Surface Angle | Vertical or Angular | |
| Material Combinations | ||
| Stud Material | C.S. (most common grade: Q235B); S.S. (most common grades: AISI 304, 316, 409, 410, 321, 347); A.S. | |
| Tube Material | C.S. (most common grade: A106 Gr.B); S.S. (most common grades: TP304, 316, 321, 347); A.S. (most common grades: T/P5, 9, 11, 22, 91) | |
| Type of Service | High temperature | |
Product Category: Studded Tube
Q1: Are you a trading company or a manufacturer?
A: We are a manufacturing factory and we can accept OEM orders. You are welcome to visit our factory and check our products.
Q2: Can I have a sample?
A: Yes, you are welcome to place a sample order to test and check quality. Mixed samples are also acceptable.
Q3: What is your lead time for production?
A: Generally, samples require 1–3 days, and mass production requires 15–30 days, depending on your request.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube