Automatic Spiral Serrated Finned Tube for Cooling Serrated Fin Tube Systems
Spiral Serrated Fin Cooling Tube
,Spiral Finned Tube
,DELLOK Serrated Fin Cooling Tube
The DELLOK serrated fin tube is a spiral-wound finned cooling tube engineered for high-efficiency heat transfer. Its serrated fin design increases turbulence and surface area, delivering superior thermal performance in demanding industrial heating and cooling applications.
| Condition | New |
|---|---|
| Applicable Industries | Fin Tube |
| Video Outgoing-Inspection | Provided |
| Machinery Test Report | Provided |
| Place of Origin | Cangzhou, China |
| Brand Name | OEM |
| Type | Fin Tube |
| Application | Heater Parts |
| Warranty | 1 Year |
| Tube Length | 18 meters max |
| Fin Height | 16 mm max |
| Tube Material | Aluminum, Copper, and Steel |
Tube Material
Carbon Steel, Stainless Steel, Copper, Titanium
Fin Material
Aluminum, Copper, Steel
Tube OD
19–273 mm
Tube Thickness
2.0–15.0 mm
Fin Thickness
0.5–3.0 mm
Fin Pitch
3.0–30.0 mm
Fin Height
8.0–16.5 mm
DELLOK (YONGHUI RADIATING PIPE MANUFACTURING CO., LTD.) was established in 2002 and is located in Jiangsu, China. After years of development, the company now holds 66 million yuan in fixed assets, employs more than 200 people, and retains 33 technical staff.
Our production capabilities include:
- 4 aluminum processing production lines with an annual processing capacity exceeding 20,000 tons
- 5 tube-drawing production lines
- 47 fin tube production lines, including 1 imported McElroy production line from the United States
- Annual production capacity of 12 million meters or more
Quality is our eternal pursuit. Our production workshop, meticulous workmanship, standardized management system, and systematic quality assurance represent DELLOK (YONGHUI)'s strongest commitment to quality. Quality control is not limited to final inspection — it is applied throughout the entire production process. We implement a comprehensive quality control and assurance system: each batch of pipes is sampled and tested, and records are retained as a quality guarantee for the final product.
Q: What is the lead time for production?
A: Generally, samples require 1–3 days, and mass production requires 15–30 days, depending on your request.
Q: What is the warranty for your products?
A: We provide a one-year warranty for our products.
Q: What payment terms do you accept?
A: Trade Assurance, TT, and Western Union.
Q: What are the modes of transportation for the machines?
A: Air freight, sea freight, express delivery, and more. We will choose the most suitable transportation method according to your requirements.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube