Copper Laser Welded Finned Tube Anti Corrosion Welded Fin Tube for Finned Tube Coil Heat Exchangers
Copper Finned Tube Coil
,Welded Copper Finned Tube Coil
,Anti Corrosion Copper Finned Tube
DELLOK (YONGHUI RADIATING PIPE MANUFACTURING CO., LTD.) was established in 2002 and is located in Jiangsu, China. After years of development, the company now holds 66 million yuan in fixed assets, employs more than 200 people, and retains 33 technical staff members.
Our production capabilities include 4 aluminum processing lines with an annual processing capacity exceeding 20,000 tons, 5 tube-drawing lines, and 47 fin tube production lines — including one imported McElroy production line from the United States. Together, these facilities deliver an annual production capacity of over 12 million meters.
Quality is our eternal pursuit. Our production workshop, meticulous workmanship, standardized management system, and systematic quality assurance represent DELLOK (YONGHUI)'s commitment to quality. Quality control is not limited to final inspection — it spans the entire production process. We implement a comprehensive quality control and assurance system: each batch of pipes is sampled, tested, and recorded as a guarantee of final product quality.
- Laser welding process
- Higher heat transfer ability compared to HF welding and wrapped fin tube
- 99%–100% fully welded, without bubbles or gaps between fins and tube
- Saves cost and assembly space due to higher efficiency
Laser welding uses a high-intensity laser beam directed at the metal surface. Through the interaction of laser and metal, the metal absorbs the laser energy and converts it into heat, melting the metal. Upon cooling and crystallization, the weld is formed.
- 99%–100% fully welded, with high thermal conductivity
- Extremely strong anti-corrosion ability
- Enhanced structure due to the welding process
- Flexible as straight tube, bent, or coiled heat exchangers
- Low heat resistance between fins and tube
- Strong resistance to shock and thermal expansion and contraction
- Cost and energy saving due to long service life and high exchange rate
- 100% welding between fin and base tube without using any filler material
- The laser welding process is carried out under a protective atmosphere, ensuring no impurity in the weld seam
Q: What is your lead time for production?
A: Generally, samples require 1–3 days, and mass production requires 15–30 days, depending on your request.
Q: What is the warranty for your products?
A: We provide a one-year warranty for our products.
Q: What payment terms do you accept?
A: Trade assurance, TT, and Western Union.
Q: What are the modes of transportation for machines?
A: Air freight, sea freight, express delivery, and other methods. We will choose the most suitable transportation method according to your requirements.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube