SA-179 Carbon Steel Laser Welded Fin Tube Coil for High Efficiency Heat Transfer Applications
Carbon Steel Fin Tube Coil
,SA-179 Fin Tube Coil
,Laser Welded Steel Fin Tube
DELLOK (YONGHUI RADIATING PIPE MANUFACTURING CO., LTD.) was established in 2002 and is located in Jiangsu, China. After years of development, the company now holds 66 million yuan in fixed assets, employs more than 200 people, and retains 33 technical staff.
Our production capabilities include 4 aluminum processing lines with an annual capacity exceeding 20,000 tons, 5 tube-drawing lines, and 47 fin tube production lines — including one imported McElroy line from the United States — delivering an annual production capacity of over 12 million meters.
Quality is our eternal pursuit. Our production workshop, meticulous workmanship, standardized management system, and systematic quality assurance represent DELLOK (YONGHUI)'s commitment to quality. Quality control is not limited to final inspection — it runs throughout the entire production process. We implement a comprehensive quality control and assurance system, sampling and testing each batch of pipes and retaining records as a quality guarantee for the final product.
- Laser welding process for a precise, durable bond
- Higher heat transfer ability compared to HF welding and wrapped fin tubes
- 99%–100% fully welded, without bubbles or gaps between fins and tube
- Saves cost and assembly space due to higher efficiency
Laser welding directs a high-intensity laser beam onto the metal surface. Through the interaction between the laser and the metal, the metal absorbs the laser energy and converts it into heat, melting the metal, which then cools and crystallizes to form the weld.
- 99%–100% fully welded, with high thermal conductivity
- Extremely strong anti-corrosion ability
- Enhanced structure due to the welding process
- Flexible as straight tube, bent, or coiled heat exchangers
- Low heat resistance between fins and tube
- Strong resistance to shock and thermal expansion and contraction
- Cost and energy saving due to long service life and high exchange rate
100% welding between fin and base tube without using any filler material. The laser welding process is carried out under a protective atmosphere, ensuring no impurity in the weld seam.
A: Generally, samples require 1–3 days, and mass production requires 15–30 days, depending on your request.
A: We provide a one-year warranty for our products.
A: Trade assurance, TT, and Western Union.
A: Air freight, sea freight, express delivery, and more. We will choose the most suitable transportation method according to your requirements.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube