316L/310 Laser Welding Fin Tube Coil for Radiators Evaporator and Laser Welded Finned Tube
316L Fin Tube Coil
,Radiators Evaporator Fin Tube Coil
,310 Laser Welding Fin Tube
DELLOK 316L/310 Laser Welding Fin Tube for Radiators and Evaporators
DELLOK laser welding fin tubes are engineered for radiators and evaporators, combining 316L/310 stainless steel tubes with precision laser-welded fins. The fully automatic welding process delivers a strong, durable bond with qualified tensile strength, making these coils a reliable choice for demanding heat transfer applications.
Established in 2002 and located in Jiangsu, China, DELLOK has grown into a substantial manufacturing operation with 66 million yuan in fixed assets, more than 200 employees, and 33 technical staff. Our production infrastructure includes:
- 4 aluminum processing production lines with an annual processing capacity exceeding 20,000 tons
- 5 tube-drawing production lines
- 47 fin tube production lines
- 1 imported production line from the American brand McElroy
- Annual production capacity of more than 12 million meters
Quality is our eternal pursuit. Our production workshop operates with meticulous workmanship, a standardized management system, and systematic quality assurance. Quality control at DELLOK is not limited to final inspection — it runs throughout the entire production process. Each batch of pipes is sampled and tested, with records kept as a quality guarantee for the final product.
- The laser welding spiral finned tube uses a fully automatic welding process, saving on manpower costs.
- Laser welding produces a solid and strong fin bond, with high tensile strength tests fully qualified.
- Laser welding offers greater efficiency advantages compared with traditional methods.
- The laser welding machine is the most advanced equipment available for spiral finned tubes. Because the welding process is fully automatic and mechanical, the scientific and technological content and quality of laser welded spiral finned tubes exceed those of traditional cooling pipes.
The following dimensions and materials (steel and aluminum) are available from stock and can be combined to suit your application.
Tubes can, among others, be manufactured in the following dimensions:
We can package products according to customer requirements to ensure safe arrival across all transportation scenarios. If you have special packaging requirements, please contact us.
A: Generally, samples need 1–3 days and mass production needs 15–30 days, depending on your request.
A: We provide a one-year warranty for our products.
A: Trade assurance, TT, and Western Union.
A: Air freight, sea freight, and express delivery. We will choose the most suitable transportation method according to your requirements.
TP304L Resistance Welded Perforated Fins Longitudinal Finned Tube for Heat Exchangers
DELLOK YONGHUI Cold Drawn Carbon Steel Fin Height 16.5mm Extruded Fin Tube
DELLOK YONGHUI Chemical Industry Stud SA335 P91 Carbon Steel Seamless Tube